2022-23 Unit Plan
Facilities, Planning and Management

Mission Statement

The purpose of Facilities Planning and Management is to create and maintain a safe, positive and appealing environment that supports student and staff success. Our mission is to increase the quality of services provided and establish metrics to verify the level achieved.

The Facilities Planning and Management (FPM) department of the Butte-Glenn Community College District is responsible for the construction, maintenance and operation of the physical plant of the District. Divisions include Custodial, Construction & Building Maintenance, Grounds, Printing, Shipping and Receiving, Transportation, Bond Management Program, utility management and the technical and clerical staff to support these functions.

The vision of an organization can be subdivided into three parts: Core Values, Purpose, and Mission. The Core Values are the basic beliefs that define us as individuals and thus as an organization. These do not change over time. Purpose is the guiding star that defines the direction the organization will always move toward. The Mission is the immediate challenge to be conquered while moving towards fulfilling the Purpose.

Program Description

The FPM department consists of eight units: Custodial Services, Construction and Building Maintenance, Grounds Maintenance, Printing Services, Shipping & Receiving, Mail Services & Asset Management, Student Transportation, Staff Motor Pool,  Bond Management Program, and Facilities Support Services. There are approximately 66 permanent employees in the department.


Accountability for Previously Funded Items


Accountability Item 1

Arts Adult Changing Table


Amount: 51385.00
Used For Intended Purpose: Yes
Benefit

This supported the remodel of one room in the Arts Building into an Adult Changing Room. The funds covered the purchase of a changing table and hoist and the cost of installation. This will assist students and their caregive to address incontinence aids, as well as a number of other tasks.



Accountability Item 2

Glenn County Center Lease Increase


Amount: 9882.00
Used For Intended Purpose: Yes
Benefit

Fund used to cover lease increase of Glenn Center.



Accountability Item 3

Cosmetology and Barbering Center Lease Increase


Amount: 4720.00
Used For Intended Purpose: Yes
Benefit

Fund used to cover lease increase of Cosmetology and Barbering Center.



Accountability Item 4

Main Campus Gas


Amount: 21943.00
Used For Intended Purpose: Yes
Benefit

Fund used to cover gas price increase on Main Campus.



Accountability Item 5

Main Campus Electric


Amount: 16558.00
Used For Intended Purpose: Yes
Benefit

Fund used to cover electricity price increase on Main Campus.



Accountability Item 6

Skyway/Chico Gas


Amount: 3582.00
Used For Intended Purpose: Yes
Benefit

Fund used to cover gas price increase at Skyway Center and Chico Center.



Accountability Item 7

Skyway/Chico Electric


Amount: 1535.00
Used For Intended Purpose: Yes
Benefit

Fund used to cover electricity price increase at Skyway Center and Chico Center.



Accountability Item 8

Cosmetology and Barbering Center Gas


Amount: 1284.00
Used For Intended Purpose: Yes
Benefit

Fund used to cover gas price increase at Cosmetology and Barbering Center.



Accountability Item 9

Cosmetology and Barbering Center Electric


Amount: 2359.00
Used For Intended Purpose: Yes
Benefit

Fund used to cover electricity price increase at Cosmetology and Barbering Center.



Accountability Item 10

Waste Water Testing/Permit


Amount: 3000.00
Used For Intended Purpose: Yes
Benefit

Fund used to cover testing and permit, which is required by law.



Student Learning/Administrative Unit Outcomes


        

Standards/Goals for Student Achievement (Instruction Departments)


        

Standards/Goals for Student Achievement (All Other Departments)


        

Strategic Direction


        

Program Review

The following goals from the previous strategic plan and program review and the current status:

• Establish and manage a facilities renewal program. Ongoing.
• Identify safety hazards and develop projects to address unsafe conditions. Ongoing.
• Assist instructional and student service departments with development of their projects. Ongoing.
      •  Work with Program to move leased facilities into permanent facilities. 
• Ensure that all District facilities, property and vehicles are in compliance with relevant regulations. Ongoing.
• Track and analyze the District’s utility usage and costs. Ongoing.
• Maintain the Bond Management Program. Ongoing.   
     • Once vacated, move five Instruction Portables to the east side of campus to support instructions in Mechanized Agriculture. In Progress.
• Implement 2016 Accessibility Survey and create a corrective maintenance plan. Ongoing.
 
    •  Address ADA Issues in Mechanized Agriculture. In Progress.
• 
Evaluate District options to mitigate the effectis of PGE's Public Safety Power Shutoff. Complete.

 


Department Goals


        

Future Development Strategies

Strategy 1 - Facilities Renewal Program

Manage facilities renewal program.


Initiatives
  • Modeling Sustainability
  • Supporting Student, Faculty and Staff Success

Supporting Rationale

The buildings represent the most valuable physical asset of the District with a current replacement value of approximately $399 million. In addition the utility infrastructure, landscape and hardscape are valuable assets of the District. All of these assets have a predictable rate of deterioration and therefore, the need for systematic renewal of these assets to provide for the future usability for District functions.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: Yes
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 2 - Safety

Identify safety hazards and develop projects to address unsafe conditions.


Initiatives
  • Supporting Student, Faculty and Staff Success
  • Maximizing Resources to Support Student Learning

Supporting Rationale

Some facility deteriorations create unsafe conditions and need to be addressed.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: Yes
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 3 - Analyze Program Needs

Meet with and discuss facility-related programatic needs for instructional and student services departments.


Initiatives
  • Modeling Sustainability
  • Enhancing a Culture of Completion and Goal Achievement
  • Supporting Student, Faculty and Staff Success
  • Using Data-Informed Processes for Continuous Improvement
  • Maximizing Resources to Support Student Learning
  • Enhancing a Culture of Equity and Inclusiveness

Supporting Rationale

Adaptive use of facility can assist instruction and delivery of student services.   FPM can provide the expertise to assist departments with their augmentation requests.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: Yes
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 4 - Regulations

Ensure that all District's facility, property and vehicles are in compliance with relevant regulations and legal obligations such as AB367.


Initiatives
  • Maximizing Resources to Support Student Learning

Supporting Rationale

To reduce the District's exposure to liability and potiental regulatory actions.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: Yes
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 5 - Utility Usage

Track and analyze District utility usage and costs.


Initiatives
  • Modeling Sustainability
  • Using Data-Informed Processes for Continuous Improvement

Supporting Rationale

Analyzing the District's utility usage will assist with budgeting for future utility costs.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: Yes
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 6 - Bond Management Program

Maintain the Bond Management Program and reclassify staff to match the department needs to support the Bond Program.


Initiatives
  • Enhancing a Culture of Completion and Goal Achievement
  • Supporting Student, Faculty and Staff Success

Supporting Rationale

Additional Program Managers are needed to support the Bond Program.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: Yes
Supports Program Review Recommendations: No
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 7 - Accessibility Survey

Implement corrective maintenance plan based on 2016 Accessibility Survey.


Initiatives
  • Enhancing a Culture of Completion and Goal Achievement
  • Supporting Student, Faculty and Staff Success
  • Using Data-Informed Processes for Continuous Improvement
  • Maximizing Resources to Support Student Learning
  • Enhancing a Culture of Equity and Inclusiveness

Supporting Rationale

Correcting the deficiencies identified in the survey will make the campus more ADA accessible.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: No
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Strategy 8 - Analyze MS4 Requirements

Continue to analyze the requirements of MS4 (Municipal Seperate STorm Sewer Systems) to see if additional staffing and testing are required. 


Initiatives
  • Modeling Sustainability
  • Supporting Student, Faculty and Staff Success

Supporting Rationale

Continue to analyze the requirements to determine if additonal staffing is needed.


Supporting Rationale Alignment
Supports the College's Strategic Direction and Priorities: No
Supports Program Review Recommendations: No
Supports Course level SLOs: No
Supports PLOs: No
Supports ILO - Think Critically: No
Supports ILO - Communicate Competently: No
Supports ILO - Engage Collaboratively: No
Supports ILO - Work Effectively: No
Supports Meeting Vision for Success Goal - Credentials: No
Supports Meeting Vision for Success Goal - Transfer: No
Supports Meeting Vision for Success Goal - Time to Degree: No
Supports Meeting Vision for Success Goal - Employment in field of Study: No
Supports Meeting Vision for Success Goal - Reducing Equity Gaps: No

Requested Non-Financial Resources

None

Current Financial Resources

None

Augmentation Requests

Original Priority Program, Unit, Area Resource Type Account Number Object Code One Time Augment Ongoing Augment
Description Supporting Rationale Potential Alternative Funding Sources Prioritization Criteria
1 Facilities Planning and Management Operating Expenses $0.00 $142,532.00
Increase in Natural Gas and Electricity Cost The District has on-going regulatory testing and inspections that are required by state and federal agencies. These regulatory requirements continue to increase in costs from the agencies and from the vendors who provide the services. The total cost of these increases is $34,701. They are for: -15% increase cost in fire alarm, fire sprinkler, FM200 annual fire inspections for the entire District. These inspections are required to assess and mitigate potential fire and life safety hazards in buildings. $10,377 -Annual Inspections of water quality reporting and permits for Main campus required by California Water Resources Board and Environmental Protection Agency for the Districts UCMR (Unregulated Contaminant Monitoring Rule) 4 permit. $2,200 -Annual backflow preventer inspection for Math building. We have added a new backflow preventer to the campus that will need inspected. $998 -New requirement to have FPM special equipment inspected by a 3rd party (boom lift, scissor lift, vertical lifts, vehicle lifts, aboveground fuel tank, and safety harness) total costs for these inspections is $3,500 annually. - Additional storm water testing due to increased asphalt at the FPM Yard and added above ground fuel tank. This is a requirement by the California Water Resources Board and Environmental Protection Agency $800 - Increase in costs for the removal of hazardous waste from the campus. The FPM budget is responsible for the removal of hazardous waste for student health clinic, welding & manufacturing, automotive and sciences. This increase per the vendor $2,120 - SWRB now requires us to provide weed abatement at our STP effluent ponds and provide annual groundwater monitoring reports in order to maintain the required Waste Water Treatment Plant permit. The report shall contain an analysis of groundwater data collected during the year and a general evaluation of any impacts the wastewater discharge is having on the groundwater quality. This report is required to be conducted by a third party that holds the proper environmental license. The District will contract with Northstar Engineering to provide this service. Total cost for both new regulations is cost $8,625 annually. - Pest control vendor will have a 10% increase in services due to material cost increase and fuel cost increase next fiscal year with an increase cost for their contract of $4,165 annually. - Increase cost in domestic water testing and reporting as required by regulation. $1,916
  • Meeting California Community Colleges Vision for Success Goals
  • Improving Processes: a. Data and Reporting; b. Internal Communications
2 Facilities Planning and Management Operating Expenses 110002108300700 $0.00 $48,768.00
New Glenn Center- Utility, Water, Weed Control and Pest Cost The new Glenn Center will come online in August 2022. Utility, water, weed control will need to be funded. Waste disposal, recycling and hazardous waste will need to be funded. Current services are being paid for by the property owner. The building will require annual fire alarm and sprinkler system and backflow preventer inspections. Total ongoing cost is $48,768. - Quarterly weed control by detention pond $1,900 - Semi-annual weed control $3,300 - Pest $1,606 - Water $3,500 - Electric $12K - Natural gas $10K - Waste disposal, recycling and hazardous waste $7,462 - Annual fire alarm and sprinkler system and backflow preventer inspections. Total ongoing cost is $9K ($7K for fire alarm and sprinkler system inspection and $2K for backflow preventer inspections) - Water softner for science lab $1195
  • Addressing Health, Life, and Safety issues
  • Addressing Program Review Recommendations
  • Addressing shortfalls in Equity, Diversity and Inclusion
  • Meeting enrollment targets
  • Meeting student achievement goals (Vision for Success Goals)
3 Facilities Planning and Mangement Operating Expenses $0.00 $24,324.00
Regulatory Testing and Inspections and Weed Abatement The District has on-going regulatory testing and inspections that are required by state and federal agencies. These regulatory requirements continue to increase in costs from the agencies and from the vendors who provide the services. The total cost of these increases is $24,324. They are for: -Annual Inspections of water quality reporting and permits for Main campus required by California Water Resources Board and Environmental Protection Agency for the Districts UCMR (Unregulated Contaminant Monitoring Rule) 4 permit. $2,200 -Annual backflow preventer inspection for Math building. We have added a new backflow preventer to the campus that will need inspected. $998 -New requirement to have FPM special equipment inspected by a 3rd party (boom lift, scissor lift, vertical lifts, vehicle lifts, aboveground fuel tank, and safety harness) total costs for these inspections is $3500 annually. - Additional storm water testing due to increased asphalt at the FPM Yard and added above ground fuel tank. This is a requirement by the California Water Resources Board and Environmental Protection Agency - $800 - Increase in costs for the removal of hazardous waste from the campus. The FPM budget is responsible for the removal of hazardous waste for student health clinic, welding & manufacturing, automotive and sciences. This increase per the vendor $2120 - SWRB now requires us to provide weed abatement at our STP effluent ponds and provide annual groundwater monitoring reports in order to maintain the required Waste Water Treatment Plant permit. The report shall contain an analysis of groundwater data collected during the year and a general evaluation of any impacts the wastewater discharge is having on the groundwater quality. This report is required to be conducted by a third party that holds the proper environmental license. The District will contract with Northstar Engineering to provide this service. Total cost for both new regulations is cost $8,625 annually. - Pest control vendor will have a 10% increase in services due to material cost increase and fuel cost increase next fiscal year with an increase cost for their contract of $4,165 annually. - Increase cost in domestic water testing and reporting as required by regulation. $1,916
  • Addressing Health, Life, and Safety issues
4 Facilities Planning and Management Operating Expenses 110002108300700 55611 $0.00 $17,807.00
Increase budget to cover for rent increase Cosmetology and Barbering Center Increase budget to cover for rent increase at Cosmetology and Barbering Center. In 2020-2021, rent was increased by 1.66%. In 2021-2022, rent was increase by 4.22%. Total ongoing budget need is $17,807.
  • Meeting California Community Colleges Vision for Success Goals
  • Addressing Program Review Recommendations
  • Meeting enrollment targets
  • Meeting student achievement goals (Vision for Success Goals)
  • Fostering a Culture of Inclusiveness
  • Strengthening Professional Development
5 Facilities Planning and Mangement Operating Expenses 110002101651000 $0.00 $10,000.00
Solar Generation Tracking Software Annual fee for data log software to track solar generation. The current software has become obsolete and support is no longer available.
  • Meeting California Community Colleges Vision for Success Goals
  • Implementing the college's Strategic Direction Priorities
6 Facilities Planning and Mangement Operating Expenses 110002101653000 54500 $0.00 $500.00
Purchase Menstrual Products to Meet AB367 AB 367 requires Community Colleges to stock restrooms with an adequate supply of free menstrual products. This request will cover the cost to purchase these products.
  • Student Equity and Achievement Program
  • Addressing Health, Life, and Safety issues
  • Addressing shortfalls in Equity, Diversity and Inclusion
  • Addressing all Areas of the Student Centered Funding Formula (enrollment growth, student need and student success)
  • Implementing the college's Strategic Direction Priorities
  • Meeting California Community Colleges Vision for Success Goals
  • Addressing Program Review Recommendations
  • Supporting improvements in Student Learning Outcomes
  • Closing Equity Gaps
  • Meeting enrollment targets
  • Meeting student achievement goals (Vision for Success Goals)
  • Fostering a Culture of Inclusiveness
7 Facilities Planning and Management Facilities 417282101710001 56220 $535,000.00 $0.00
Schedule Maintenance Lead Removal Fire Range Lead Removal Fire Range.
  • Scheduled Maintenance (Facilities)
  • Meeting California Community Colleges Vision for Success Goals
  • Addressing Health, Life, and Safety issues
  • Meeting enrollment targets
  • Meeting student achievement goals (Vision for Success Goals)
8 Facilities Planning and Mangement Facilities 417282101710001 56100 $150,000.00 $0.00
Schedule Maintenance Reconfigure waste disposal ponds per SWRB recommendations Reconfigure waste disposal ponds per SWRB recommendations
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
9 Facilities Planning and Mangement Facilities 417282101710001 56220 $350,000.00 $0.00
Schedule Maintenance Repair STP Digester pool before failure Repair STP Digester pool before failure
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
10 Facilities Planning and Mangement Operating Expenses 417282101710001 56220 $250,000.00 $0.00
Scheduled Maintenance Repair/Replace Solar inverters and equipment -Phase I Repair/Replace Solar inverters and equipment -Phase I
  • Scheduled Maintenance (Facilities)
  • Addressing shortfalls in Equity, Diversity and Inclusion
  • Implementing the college's Strategic Direction Priorities
  • Meeting California Community Colleges Vision for Success Goals
  • Meeting student achievement goals (Vision for Success Goals)
11 Facilities Planning and Mangement Operating Expenses 417282101710001 56100 $100,000.00 $0.00
Schedule Maintenance Repair skid pan apron for cadet training Repair skid pan apron for cadet training
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
  • Meeting enrollment targets
12 Facilities Planning and Mangement Facilities 417282101710001 56220 $150,000.00 $0.00
Schedule Maintenance Chico Center Restroom Renovation Chico Center Restroom Renovation
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
  • Meeting enrollment targets
13 Facilities Planning and Mangement Facilities 417282101710001 56220 $150,000.00 $0.00
Schedule Maintenance LRC Restroom Renovation LRC Restroom Renovation
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
  • Addressing shortfalls in Equity, Diversity and Inclusion
  • Closing Equity Gaps
  • Meeting enrollment targets
14 Facilities Planning and Mangement Facilities 417282101710001 56100 $175,000.00 $0.00
Schedule Maintenance Create ADA path to Baseball Field and Soccer Field Create ADA path to Baseball Field and Soccer Field
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
15 Facilities Planning and Mangement Facilities 417282101710001 56100 $50,000.00 $0.00
Schedule Maintenance Repair sidewalks at AHPS Exterior Repair sidewalks at AHPS Exterior
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
16 Facilities Planning and Mangement Equipment 417282101710001 56220 $150,000.00 $0.00
Schedule Maintenance HVAC Repairs/Replacement Campus Wide HVAC Repairs/Replacement Campus Wide
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
  • Meeting enrollment targets
17 Facilities Planning and Mangement Facilities 417282101710001 56100 $235,000.00 $0.00
Schedule Maintenance Irrigation repairs and replacements and water conservation landscaping District wide Irrigation repairs and replacements and water conservation landscaping District wide
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
  • Meeting enrollment targets
18 Facilities Planning and Mangement Facilities 417282101710001 56220 $350,000.00 $0.00
Schedule Maintenance Repair interior finishes to MLR/WLR Restrooms Repair interior finishes to MLR/WLR Restrooms
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
  • Meeting enrollment targets
19 Facilities Planning and Mangement Facilities 417282101710001 56220 $175,000.00 $0.00
Schedule Maintenance Repair interior finishes CHC Hallways and Corridors Repair interior finishes CHC Hallways and Corridors
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
  • Meeting enrollment targets
20 Facilities Planning and Mangement Facilities 417282101710001 56220 $152,000.00 $0.00
Schedule Maintenance Reseal exterior windows CHC & AHPS Reseal exterior windows CHC & AHPS
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
  • Meeting enrollment targets
21 Facilities Planning and Mangement Facilities 417282101710001 56220 $150,000.00 $0.00
Schedule Maintenance Repair and paint hallways AHPS Repair and paint hallways AHPS
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
  • Meeting enrollment targets
  • Closing Equity Gaps
  • Meeting student achievement goals (Vision for Success Goals)
22 Facilities Planning and Mangement Facilities 417282101710001 56220 $100,000.00 $0.00
Schedule Maintenance Install water building isolation valve & regulators Install water building isolation valve & regulators
  • Scheduled Maintenance (Facilities)
  • Addressing Health, Life, and Safety issues
8/2/23